Modelagem dos dados de falha de uma bomba de refrigeração de alto-forno

Authors

DOI:

https://doi.org/10.15536/thema.V19.2021.721-730.2309

Abstract

The maintenance of equipment is becoming increasingly important, being responsible for sustaining the quality and competitiveness of industries in the current globalized world. In this way, the reliability study is of paramount importance for industrial maintenance, as it assists in predicting failures and, consequently, increasing the availability and productivity of industrial equipment. It is necessary to have knowledge about the equipment to perform the reliability analysis and to determine the modes and causes of failures. The present work aims at modeling the times until the failure of a blast furnace cooling pump. The times were supplied by the company Ligas de Alumínio S/A, situated in the north of Minas Gerais and analyzed using ProConf software. The Weibull distribution was the best fit for the data set. The results indicate that the refrigeration pump is at the end of the infant mortality phase, with tendency to stabilize the failure rate. That is, it is at the beginning of its useful life, indicating the use of predictive maintenance.

Downloads

Download data is not yet available.

Author Biographies

  • Paulo César de Resende Andrade, Universidade Federal dos Vales do Jequitinhonha e Mucuri - UFVJM

    Dr. em Estatística

    Professor Associado I do Isntituto de Ciência e Tecnologia da Universidade Federal dos Vales do Jequitinhonha e Mucuri - UFVJM

  • Gabriel Acyprest Maciel, Federal University from Jequitinhonha and Mucuri's Valleys

    Graduando em Engenharia Mecânica.

Published

2021-11-23

Issue

Section

Engenharias

How to Cite